Week 2 | Engineering homework help

Week 2 | Engineering homework help.

Review the following industry resources to expand your understanding of the topics explored in this module:

·  NTSB Investigation Party Form (PDF)/NTSB.gov (Links to an external site.)

·  Major Investigations Manual – Appendix F (PDF)/NTSB.gov (Links to an external site.)

·  Statistical Summary of Commercial Jet Airplane Accidents – Worldwide Operations (1959-2012) (PDF)/boeing.com (Links to an external site.)

Additionally, briefly review the NTSB Board Meeting Resources (listed below) for US Airways Flight 1549 January 15, 2009 ditching on the Hudson River in New York City to gain a better perspective of the roles technical experts play, and the valuable content and resources developed:

·  Investigator-in-Charge (PPT) 

·   Download Investigator-in-Charge (PPT) 

·  Powerplants (PPT) 

·   Download Powerplants (PPT) 

·  Wildlife Factors (PPT) 

·   Download Wildlife Factors (PPT) 

·  Human Performance (PPT) 

·   Download Human Performance (PPT) 

·  Survival Factors (PPT) 

·   Download Survival Factors (PPT) 

·  Flight Path Ditching of U.S. Airways Fight 1549, Airbus A320, N106US, in the Hudson River/YouTube (4:33)

MIL-STD-882E, Standard Practice for System Safety by the Department of Defense (DoD – PDF) 

·  Section 4 – General Requirements

·  Task 201 – Preliminary Hazard List

·  Section 5 – Detailed Requirements

·  Task 202 – Preliminary Hazard List

For a simple to follow history of the changes to the MIL-STD-882 series and highlights of the changes that were made through version D (the latest version is now E but the discussion has not been updated as of yet), review these slides from Robert Smith’s presentation at a National Defense Industrial Association (NDIA) conference in 2008. Update on Revisions to MIL-STD-882 (PDF)

·  Air Force System Safety Handbook (System Safety – PDF) (Links to an external site.)

·  Chapter 3 – Risk Assessment

·  Chapter 4 – System Safety Program

·  Chapter 5 – System Safety Program Plan (SSPP)

·  Appendix – An Approach to Risk Assessment

·  System Safety and Risk Management: A Guide for Engineering Educators (NIOSH) Instructional Module 

·   Lesson II – Risk Management (PDF) 

·  Lesson III – Preliminary Hazard Analysis (PDF) 

·  Appendix B – Example Worksheet for Preliminary Hazard Analysis (PDF) 

Week 2 | Engineering homework help

Calculate your order
Pages (275 words)
Standard price: $0.00
Client Reviews
4.9
Sitejabber
4.6
Trustpilot
4.8
Our Guarantees
100% Confidentiality
Information about customers is confidential and never disclosed to third parties.
Original Writing
We complete all papers from scratch. You can get a plagiarism report.
Timely Delivery
No missed deadlines – 97% of assignments are completed in time.
Money Back
If you're confident that a writer didn't follow your order details, ask for a refund.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Power up Your Academic Success with the
Team of Professionals. We’ve Got Your Back.
Power up Your Study Success with Experts We’ve Got Your Back.